- predefined tool assembly templates for different tool types enable even simpler assembly without any errors (clx)
- support for more than four insertion points on the workpiece side to make more complex tools easier to assemble (gl & clx)
- option to display iso 13399 parameters (gl & clx)
- better visualization in the 3d tool assembly(gl)
- integration of data transfer into the 3d assembly dialog
- display of the parts list as a tree structure
- shared widget and editing dialog for insertion points and separation points (gl)
- grooving and turning tools can now be set up "overhead " according to their area of application (gl)
we develop with practical applications in mind: concrete implementation of customer suggestions
- production orders: introduction of status management for orders and work steps (gl)
- shopfloor manager: advanced filter options for selecting production orders (gl)
- logistics: direct order assignment of tool booking, including evaluation, leads to greater cost transparency (gl)
- customizing: management of customer-specific scripts now possible (gl)
- new interface with cribwise (gl and clx)
- new cam interface with cimatron (gl and clx)
- new 2022足球世界杯32强 scaneasy module: mobile barcode scanner solution – for easy handling in the production environment: real-time booking via wi-fi, browser-based, modern and efficient (gl and clx)
- extensions in the 2022足球世界杯32强 storeasy cabinet software: new features include the booking of tool assemblies, gauge and calibration equipment and fixtures, as well as direct access to data from the 2022足球世界杯32强 webcatalog for optimal data management
- 2022足球世界杯32强 purchase requisition module: transfer of order requests via excel export to the erp system – ideal for users without a direct erp connection (gl)
- new: additional interface modules control the led pointers from kardex and hänel and the kardex led navigator, making it easier to retrieve stock locations during storage and retrieval (gl and clx)
- 2022足球世界杯32强 shopcontrol: gauge and calibration equipment and fixtures can now also be planned and booked to ensure a transparent flow of operating resources to the machine (clx)